Contractors

  • EnergyEdge® rails can be used in place of, or in addition to wooden form boards.
  • Products remain in place after construction reducing labor efforts with less stripping and recovery
  • EnergyEdge products reduce waste, hauling, and landfill costs.

EnergyEdge Forming Comparison of Slab Edge Wood Forms vs Insulated Slab Edge

EnergyEdge: Basic Product Assembly

The EnergyEdge system has two rail profiles- EE8fb and the EE8mb. Both are assembled in the same manner. The rails are 12′ long and are nested together for shipping. The braces & corner pieces come in boxes. The braces “clip” into the bottom and top of each rail and serve as the joints and anchors into the concrete. See installation techniques for quantity & spacing requirements.

Installation Techniques for Exterior Slab Insulation- New Construction

Products can be installed using numerous techniques and foundation types including:

Monolithic

Two-Pour

Stemwall/ CMU

Wall Forms

type1pour monolithic slab placement w exterior insulation type2pour rough foundation & gradebeam application with exterior slab insulation type3pour stemwall and CMU foundation w exterior slab insulation type 4 pour wall form for basements or poured walls with exterior insulation

EnergyEdge Rails set for monolithic pour using external support system.

EnergyEdge Rails set on Rough Foundation  using external support system

EnergyEdge Rails secured with EnergyEdge  internal bracing system on pre-leveled foundation.

EnergyEdge acts as a form liner inside wall forms for poured walls and basements.

Click here to download EnergyEdge Installation Brochure

Don’t forget to visit our Featured Projects Page!